$2.50
2000 in stock
Origin | Mainland China |
---|---|
Certification | CE |
Phase | 3 |
Electricity Type | AC |
Model Number | CJX2-09 |
Main Circuit Rating Current | 18A |
Main Circuit Rating Voltage | 380V |
Number of Pole | 3 |
Application | Electrical Power |
Standard | IEC60947 |
Coil Voltage | 380VAC |
Frequency | 50/60 HZ |
Contact material | silver |
Rated Current | 9A-95A |
Max rated voltage | 1000v |
CJX2-09 with Silver Content 50% air conditioning ac contactor
Application:
CJX2 series AC contactor(simplified as contactor in the following)is suitable for
using in thecircuits up to the rated voltage 660VAC 50Hz or 60Hz, rated current 95A,
for making and breaking and frequent starting.
It is combined into the delay contactor, mechanical interlocking contactor,
star-delta starter, with the thermal relay. it is combined into the electromagnetic starter.
Technical Specification:
This series of products are up to standard:IEC60947-4; GB14048.4
Outshape dimensions and mounting dimensions:
Pls kindly note, it’s important to know the duration of of the whole order process.
For the hot sale model and supplier standard model products, generally they have samples in stock, so you can require a sample quickly and easily. Send the sample request, supplier ship out the samples in 1-3 days by express, you will receive the samples in 7-30 days.
Custom sample lead time depends on your specific requirements and products.OEM packag, such as paper box packag, it’s easy for any suppliers to do it, if you need exist product in custom packag, it takes 4-7 days will be ok.
It depends on the order quantity. The production lead time refers to the number of days required by the factory. After receiving the order, the entire production is completed and ready for shipment. Most of the product supply takes 15-30 days.
There are different shipping ways for options. Air shipping is fast but expensive, it’s a good choice for urgent orders, it only takes 7-10 days max. Sea shipping is the most economical shipping way, time is much longer than air, takes 20-30 days.
20,000 square meters warehouse, plenty inventory and well managed.
Inventory includes, micro switches, limit switches, travel switches, foot switches, toggle switches, solid state relays,
For retailers, we accept small orders. We thiank this is really good for you
For distributors, buy in bulk can get a better price. Save purchasing costs for you.
DELIVERIES ARE ONLY MADE MONDAY THROUGH FRIDAY
is not responsible for weather delays or other carrier issues.
Standard ground transportation of inventory items takes approximately 2-7 working days. Except for national holidays, shipments are only available from Monday to Friday. The quantity of all products determines the shipping carrier.
FedEx 2nd and Next Day Air Orders typically ship the first business day after an order is placed.Deliveries are only made Monday through Friday. No deliveries will be made on weekends or holidays. Please note that per FedEx policy not all areas are guaranteed to receive overnight deliveries. Carriers may only count business days for 2nd day delivery dates.
Products are shipped by freight and usually leave the warehouse within 3-5 days. Our order volume is very large, and our warehouse is working hard to process the order as soon as possible. thank you very much for your patience. For more information about our shipping policy, please see below.
Enter your request below and send it to us, and we’ll get back to you ASAP!